Monday, May 5, 2014

Flushing of Water Mains

Tuesday May 6, 2014 through June 13, 2014
During the weeks of May 6, 2014 through June 13, 2014 water system personnel will be flushing all fire hydrants in the water system. This procedure allows the water system to flush the water mains and simultaneously the hydrants are checked for damage, leakage, flow and operation. The water system will also be conducting hydrant flow testing at the same time.
See this PDF for complete details